SK408
Date: 6.10.2015.

Drilled 5 back to back gas discoveries in 2014 finding about 2.2 TCF gas. 3 exploration wells will be drilled in Q4 2015. A large 3D Seismic Survey will be acquired in 2016. The gas discoveries are moving through the Field Development Plan (FDP) process with 1st gas expected in Q4 2018.