The first purpose built semi-submersible self-erecting tender assisted drilling (TAD) rig was delivered on 06th April 1994 featuring dual BOP system (21 ¼ 2k & 13 5/8” 10k). The unit was upgraded with a bootstrap mast, quadruple and offline activity capability in 2004.