Sustainability

Tender units require a fixed platform or floating platform from which multiple wells can be drilled.

The tender rig concept allows for reduced CAPEX and OPEX for our partners over the full duration of the fields thanks to:

  • Multiple wells drilled from one area, reducing time between wells and improving personnel & logistic planning synergies this, along with a much shorter well duration resulting in improved performances in batch-drilling, SIMOPS and dry tree operations.
  • Improved maintenance plans and overall CAPEX and OPEX costs for the entire life of the field.
  • Higher utilization rate of the drilling equipment due to its mobility